The geological conditions of Zhangjihuai railway is complex,the structure and karst are extensively developed,and hence the risk of construction is high.Based on the construction of Zhangjihuai railway,this paper expounds the difficulties,prediction principles and key geophysical techniques of the railway tunnel geological prediction,and summarizes a set of technologies for the railway tunnel geological prediction.The practical examples show that the five-step method is useful in geological prediction,the surface exploration data are important for dividing the key sections for macroscopic control,the long-distance prediction and short-distance prediction of geophysical exploration technology should be used together,and the advance drilling must be used to verify the geophysical exploration anomalies,so that the prediction work can be a closed-loop, which is conducive to avoiding risks and reducing false reports.The whole set of advanced forecast technologies of Zhangjihuai railway is feasible and useful,which is worthy of spreading.
蔡盛. 张吉怀铁路隧道超前预报技术应用研究[J]. 物探与化探, 2021, 45(5): 1275-1280.
CAI Sheng. The research on the application of geological prediction technology to Zhangjihuai railway tunnel. Geophysical and Geochemical Exploration, 2021, 45(5): 1275-1280.
Cui D H, Yang Q P. Applicable study of geophysical exploration technology for Karst under tunnel on Yichang-Wanzhou Railway[J]. Journal of Railway Engineering Society, 2019, 125(2):80-84.
Dai Q W, Wang P F, Feng D S. Application of integrated geophysical prospecting method in the leading geological forecast of tunnel faces[J]. Geotechnical Investigation & Surveying, 2012, 40(8):84-88.
Ye Y. Research on the method and technology for geological forecast in advance for new type tunnel[J]. Journal of Railway Engineering Society, 2009, 132(132):59-63.
Shen J X, Xue F S, Zou W. Application of comprehensive geophysical exploration technology in Karst Tunnel[J]. Journal of Changsha Railway University:Social Science Edition, 2012, 13(1):212-215.
Tan T Y, Ye Y, Zhang W. Comprehensive physical detecting technology in geological over-forecast of tunnel engineering[J]. Guizhou Water Power, 2006, 20(6):13-18.
Chen D J, Wang S D, Wang G Q. Application of comprehensive geophysical prospecting method in advanced geological prediction of tunnel[J]. Railway Investigation and Surveying, 2017, 43(5):18-22.
Zhang Y, Yang J, Zhou L M, et al. Common interference and the prediction of rock fissure water and weak interlayer in tunnel construction using TSP[J]. Progress in Geophysics, 2018, 33(2):892-899.
Dai Q W, He G, Feng D S. Application of the TSP-203 system in geological advanced prediction of tunnel[J]. Progress in Geophysics, 2005, 20(2):460-464.
Shu S. A discussion on the improvement of the application accuracy of the TSP203 system[J]. Geophysical and Geochemical Exploration, 2013, 37(5):710-714.
Li Z L. TSP203 A tentative discussion on some problems influencing the results of TSP203 detection[J]. Geophysical and Geochemical Exploration, 2015, 39(5):1085-1088.
Shu S, Wang S D, Li G, et al. The application of TEM to guiding advance exploration drilling of complex geological tunnel[J]. Geophysical and Geochemical Exploration, 2018, 42(6):1311-1316.
Fan T. A 3D continuous velocity analysis of TEM fictitious wave-field and its application to tunnel advanced prediction[J]. Geophysical and Geochemical Exploration, 2011, 35(2):243-245.
Fan Z F, Li T B, Meng L B. Advanced geological forecast of application of GPR in road tunnel[J]. Geophysical and Geochemical Exploration, 2010, 34(1):119-122.
Deng G W, Wang Q R, Liao J P, et al. Forward modeling and advanced detection of radar in adverse geological phenomena tunnel[J]. Geophysical and Geochemical Exploration, 2015, 39(3):651-656.