With the merits of simplicity and rapidness, the negative apparent velocity method has been used widely in tunnel geological prediction. The regular method indicates that the intersection of time-distance curves of direct wave and reflected wave is just the position of reflecting interface. However, for inclined interface, the interface position cannot be identified accurately if we only extend time-distance curves. What's more, the more lean the angle, the greater the error. This leads to serious accidents in practice because of inaccurate prediction. Aimed at solving the problem, the authors mainly studied the inclined interface, used the newest coordinates method to get time-distance curve of reflected interface, and then fitted their interpolation, mainly including polynomial fitting curve, unitary three-points isometric interpolation and interpolation by continued fractions. Through a lot of tests and comparisons of the characteristics of all interpolation fittings, the time distance curve interpolation by polynomial fitting can be worked out so as to identify the position of reflected interface accurately. Finally, interface dip (apparent dip) can be calculated using geometric formula. This method facilitates the data processing by means of negative apparent velocity.
侯伟, 杨正华. 负视速度超前预报倾斜界面位置确定[J]. 物探与化探, 2015, 39(5): 1089-1093.
HOU Wei, YANG Zheng-Hua. The determination of the position of tilted interface matching in negative apparent velocity tunnel seismic prediction. Geophysical and Geochemical Exploration, 2015, 39(5): 1089-1093.
[1] 程乾生.数字信号处理[M].北京:北京大学出版社,2008.[2] 杨耀.地震视负速度法在隧道超前地质预报中的应用[J].工程地球物理学报,2009,6(6):754-758.[3] 曾昭璜.隧道地震反射法超前预报[J].地球物理学报, 1994, 37(2):218-230.[4] 赵永贵.中国工程地球物理研究的进展与未来[J].地球物理学进展,2002,17(2):301-304.[5] 刘秀峰,李忠.TSP探测数据采集和处理中应注意的问题[J].石家庄铁道学院学报, 2002,15(2): 56-59.[6] Liu X W, Liu H, Li Y M.High resolution radon transform and its application in seismic signal processing[J].Progress in Geophysics (in Chinese), 2004,19(1):8-11.[7] Eaton D W,Clarke G.A Kirchhoff integral method tomodel 3-D elastic-wave scattering[C]//Expanded Ab-stracts of 70thAnnual International SEG Meeting,2000,1-4.[8] 何振起,李海,梁彦忠.利用地震反射法进行隧道施工地质超前预报[J].铁道工程学报,2000;4: 81-85.[9] 张景科,谌文武,雷启云.TSP203地质超前预报原理及其提高精度的途径[J].西部探矿工程,2005,17( 7):101-103.[10] Einar M. Sampling,aliasing,and inverting the linear Radon transform[J].geophysics,2004,69(3):859-861.[11] Kennet P,Ireson R L.The VSP as an interpretation toll for structural and stratigraphic Analysis[C]//SEG 1st Annual Meeting,1981.[12] 朱光明.数字信号分析与处理[M].西安:陕西人民教育出版社,2003.[13] 李庆扬,王能超,易大义.数值分析[M].北京:清华大学出版社,2008.[14] 程乾生.信号数字处理的数学原理[M].北京:石油工业出版社,1979.[15] 蔡运胜.TSP203 型隧道超前地质预报系统及应用[J].物探与化探,2004,28(2):184-186.[16] 郭有劲.综合物探方法在隧道超前预报中的应用研究[D].北京:中国地质大学,2010.[17] 刘云祯.TGP隧道地震波预报系统与技术[J].物探与化探,2009,33(2):170-177.[18] 舒森.如何提高TSP203系统在应用中的准确性[J].物探与化探,2011,35(5):1710-714.[19] 王晓川,康勇,夏彬伟.对提高TGP隧道地质预报系统准确性的分析[J].物探与化探,2012,36(1):153-158.