Discussion on floating datum and rugged topography |
XU Wei-Ya( ) |
Sinopec Petroleum Exploration and Production Research Institute,Beijing 100083,China |
|
|
Abstract Determination of the spatial position of the rugged topography surface is the key to the success of the pre-stack depth migration and velocity modeling on relief surface.The floating datum is not only a rugged topography elevation surface,but also defines the rules on which the CMP gathers are used for datum corrections.Analyzed the definition of the floating datum and clarified the physical meaning of the floating datum in general situations.The seismic data and velocity on floating datum can be directly used for topography pre-stack depth migration and velocity modeling under specific conditions.Discussed the situation that the improper use of floating datum data and corresponding RMS velocity in pre-stack depth migration and velocity modeling might result in shifting and distortion of the horizon layers in depth migration results.
|
Received: 10 December 2019
Published: 01 March 2021
|
|
|
|
|
|
Datum position of the same source in different CMP gathers
|
|
Datum position of the same detector in different CMP gathers
|
|
Depth error in migration results from incorrect migration surface
|
[1] |
刘治凡. 基于浮动基准面的两步法静校正[J]. 石油物探, 1998,37(1):136-142.
|
[1] |
Liu Z F. Two step static correction based on floating datum[J]. GPP, 1998,37(1):136-142.
|
[2] |
刘治凡, 毛海波, 邵雨, 等. 复杂地表区基准面和静校正方法的选择[J]. 石油物探, 2003,42(2):240-247.
|
[2] |
Liu Z F, Mao H B, Shao Y, et al. Adoption of datum planes and statics methods in complex surface areas[J]. GPP, 2003,42(2):136-142.
|
[3] |
李振春. 地震偏移成像技术研究现状与发展趋势[J]. 石油地球物理勘探, 2014,49(1):1-21.
|
[3] |
Li Z C. Research status and development trends for seismic migration technology[J]. OGP, 2014,49(1):1-21.
|
[4] |
刘江平. 复杂地形下的一种地震野外静校正的新方法——浮动基准面静校正[J]. 物探与化探, 1996,20(3):218-222.
|
[4] |
Liu J P. A new method for field seismic statics under the condition of complex topography-floating datum plane statics[J]. Geophysical and Geochemical Exploration, 1996,20(3):218-222.
|
[5] |
高秦, 陈超群, 王智茹, 等. 多方法静校正融合技术在鄂尔多斯盆地黄土塬区中的应用[J]. 石油地球物理勘探, 2017,52(s2):38-44.
|
[5] |
Gao Q, Chen C Q, Wang Z R, et al. Multiple statics fusion in loess tablelands,Ordos Basin[J]. OGP, 2017,52(s2):38-44.
|
[6] |
吕晓春, 单娜琳, 顾汉明, 等. 浮动基准面下静校正对速度分析精度的影响分析[J]. 工程地球物理学报, 2011,8(2):155-160.
|
[6] |
Lyu X C, Shan N L, Gu H M, et al. Effect of floating datum for static correction on velocity analysis accuracy[J]. Chinese Journal of Engineering Geophysics, 2011,8(2):155-160.
|
[7] |
张宇. 从成像到反演:叠前深度偏移的理论、实践与发展[J]. 石油物探, 2018,57(1):1-23.
|
[7] |
Zhang Y. From imaging to inversion:Theory,practice,and technological evolution of prestack depth migration[J]. GPP, 2018,57(1):1-23.
|
[8] |
谢万学, 李德珍, 金德刚, 等. 起伏地表叠前成像技术在川东高陡构造工区中的应用[J]. 地球物理学进展, 2018,33(5):2020-2026.
|
[8] |
Xie W X, Li D Z, Jin D G, et al. Application of pre-stack seismic imaging from rugged topography in complex structure survey of eastern Sichuan Basin[J]. Progress in Geophysics, 2018,33(5):2020-2026.
|
[9] |
王狮虎, 罗国安, 寇芹, 等. GeoEast系统积分法叠前时间偏移技术[J]. 石油工业计算机应用, 2016,24(3):20-25.
|
[9] |
Wang S H, Luo G A, Kou Q, et al. GeoEast system integral prestack time migration technology[J]. Computer Applications of Petroleum, 2016,24(3):20-25.
|
[10] |
李忠平, 李以严, 周从业. 涪陵焦石坝三维工区高精度速度建场方法[J]. 石油物探, 2018,57(3):356-361.
|
[10] |
Li Z P, Li Y Y, Zhou C Y. High precision velocity field building in the Jiaoshiba 3D seismic survey area of the Fuling shale gas field[J]. GPP, 2018,57(3):356-361.
|
[11] |
王华忠, 张兵, 刘少勇. 山前带地震数据成像处理流程探讨[J]. 石油物探, 2012,51(6):574-583.
|
[11] |
Wang H Z, Zhang B, Liu S Y. Discussion on the imaging processing workflow for foothill seismic data[J]. GPP, 2012,51(6):574-583.
|
[12] |
曲英明. 起伏地表直接成像技术研究进展[J]. 石油物探, 2019,58(5):625-644.
|
[12] |
Qu Y M. Research progress of topographic imaging methods[J]. GPP, 2019,58(5):625-644.
|
[13] |
林伯香. RG值应是等效低速带的静校正量[J]. 石油地球物理勘探, 2004,39(6):656-660.
|
[13] |
Lin B X. RG-statics of equivalent LVZ[J]. OGP, 2004,39(6):656-660.
|
[14] |
Yilmaz Ö. Seismic data analysis[M]. Tulsa:Society of Exploration Geophysicists, 2001.
|
[15] |
林伯香, 孙晶梅, 刘起弘, 等. 关于浮动基准面概念的讨论[J]. 石油物探, 2005,44(1):94-97.
|
[15] |
Lin B X, Sun J M, Liu Q H, et al. Discussion to the concept of the floating datum[J]. GPP, 2005,44(1):94-97.
|
[16] |
Sheriff R E. Encyclopedic dictionary of applied geophysics[M]. Tulsa:Society of Exploration Geophysicists, 2002.
|
[17] |
林伯香. 最小静校正误差浮动基准面方法[J]. 石油地球物理勘探, 2003,38(6):611-617.
|
[17] |
Lin B X. A new method for determination of floating datum in static corrections[J]. OGP, 2003,38(6):611-617.
|
[18] |
王胜春, 李进, 胡珊珊. 基于非局部均值滤波的复杂地表区浮动基准面计算方法[J]. 地球物理学进展, 2018,33(5):1985-1988.
|
[18] |
Wang S C, Li J, Hu S S. Method for calculating the floating datum in complex surface area based on NLM filter[J]. Progress in Geophysics, 2018,33(5):1985-1988.
|
[19] |
刘定进, 蒋波, 李博, 等. 起伏地表逆时偏移在复杂山前带地震成像中的应用[J]. 石油地球物理勘探, 2016,51(2):315-324.
|
[19] |
Liu D J, Jiang B, Li B, et al. Rugged-topography reverse time migration in complex piedmont zone[J]. OGP, 2016,51(2):315-324.
|
[20] |
王华忠, 刘少勇, 杨勤勇, 等. 山前带地震勘探策略与成像处理方法[J]. 石油地球物理勘探, 2013,48(1):151-159.
|
[20] |
Wang H Z, Liu S Y, Yang Q Y, et al. Seismic exploration strategy and image processing in mountain areas[J]. OGP, 2013,48(1):151-159.
|
[1] |
QI Peng. Local tomographic velocity modeling of deep anhydrite-bearing rocks[J]. Geophysical and Geochemical Exploration, 2022, 46(4): 982-987. |
[2] |
Hai-Long PENG, Jian-Wei HE, Ting REN, Dun DENG, Fan JIANG, Rui-Ming WANG, Wen-Xiang ZHANG. The application of 3D velocity modeling based on geological constraint in Qiongdongnan basin deep water complex fault block area[J]. Geophysical and Geochemical Exploration, 2018, 42(3): 537-544. |
|
|
|
|