|
|
THE SELECTION AND EFFECTIVENESS OF GEOPHYSICAL METHODS IN THE EXPLORATION OF PERPETUALLY FROZEN GROUND ALONG THE QINGHAI-TIBET RAILWAY |
WANG Wen-long |
Geophysical Exploration Company, No.1 Investigation and Designing Institute Ministry of Railways, Lanzhou 730000, China |
|
|
Abstract During the construction of the Qinghai-Tibet Railway, the perpetually frozen ground constitutes a key problem. The geophysical exploration will meet more complex and changeable objects in the perpetually frozen ground area than in the non-frozen area. Hence, the selection of rational working methods seems to be especially important. Based on a discussion on the strong and weak points of various currently-used geophysical techniques, the author advances the idea of integrated geophysical exploration with the enumeration of some practical examples. Practice shows that the integrated geophysical exploration is an effective means in the exploration of perpetually frozen ground.
|
Received: 27 July 2002
Published: 24 April 2003
|
|
|
|
|
[1] |
LI Di-Quan, XIAO Jiao-Yu, ZHANG Ji-Feng, HU Yan-Fang, LIU Zui-Liang, ZHANG Xin. Comparison of application effects of WFEM and CSAMT in water-rich area of Xinyuan Coal Mine[J]. Geophysical and Geochemical Exploration, 2021, 45(5): 1359-1366. |
[2] |
YU Yong-Peng, YAN Zhao-Tao, MAO Xing-Jun, YANG Yan-Cheng, MA Yong-Xiang, HUANG Peng-Cheng, LU Ai-Guo, ZHANG Guang-Bing. The application of the comprehensive electric and seismic method to coal exploration in the huge Cenozoic coverage area[J]. Geophysical and Geochemical Exploration, 2021, 45(5): 1231-1238. |
|
|
|
|