|
|
THE APPLICATION AND IMPROVEMENT OF THE FREQUENCY-INITIAL VELOCITY PILE MEASUREMENT METHOD |
Zhou Guanglong |
Hunan University, Changsha 410012 |
|
|
Abstract The present paper has made a detailed description of the theory and Prance of the frequency-initial velocity pile measurement method, and has suggeded some technical measures to tackle the problems that oxist in qualification and quality examindion of pile measuremnt.
|
Received: 09 December 1993
Published: 24 April 1994
|
|
|
|
[1] |
CHEN Da-Lei, WANG Run-Sheng, HE Chun-Yan, WANG Xun, YIN Zhao-Kai, YU Jia-Bin. Application of integrated geophysical exploration in deep spatial structures: A case study of Jiaodong gold ore concentration area[J]. Geophysical and Geochemical Exploration, 2022, 46(1): 70-77. |
[2] |
YANG Dan, LI Wei, WEI Yong-Liang, SONG Bin. Application of dual-tree complex wavelet transform in advanced geological prediction of the tunnel section in Lalin of Sichuan-Tibet Railway[J]. Geophysical and Geochemical Exploration, 2021, 45(6): 1504-1511. |
|
|
|
|