Abstract This paper describes the research outcomes of the direct problem in such aspects as the discovery of blind ore bodies near or at the bottom of theborehole and the prediction of lateral extension of rock or ore bed alreadyexposed by drilling when analytical theoretical calculation, physical simulationand numerical simulation are used to conduct apparent resistivity and IP survey of single-pore multielectrode array. In addition, the general interpreta tion rules are given.
|