1. Haikou College of Economics, Haikou 570100, China 2. Shaanxi Engineering Investigation Institute, Xi'an 710000, China 3. Ningbo Yitong Construction Co., Ltd.,Ningbo 315800, China
Based on the principle of hydration heat release and indoor and outdoor tests, it is found that there is a significant temperature difference between the concrete mixture layer and the floating slurry layer, indicating that the pouring height of the concrete mixture can be determined by the temperature change. A portable temperature control device is designed to determine whether the concrete mixing surface reaches the designed height, that is to say, a temperature sensor is respectively embedded at the height of the designed pile top and at the height of 50cm below, and the temperature sensor of 50cm below the height of the designed pile top is used to obtain the temperature peak of the concrete mixture, and then the temperature peak of the temperature sensor at the height of the designed pile top is used to determine the concrete mixture top. It is suggested that the concrete mixture should be overfilled at the height of the designed pile top, namely 50cm above the second temperature sensor, which is 0.3m less than the norm and can save concrete.
Shao C, Yan T N, Lan K , et al. Study on altitude measurement of concrete injection surface of bored pile with ultrasonic wave[J].Geotechnical Investigation & Surveying, 2009(6):74-78.
[2]
付祖良 . 钻孔灌注桩水下混凝土拌合物灌注技术研究与应用[D]. 武汉:华中科技大学, 2006.
[2]
Fu Z L . Research and Application on the Technology of Pouring Concrete of Bored Piles Under Water[D]. Wuhan:Huazhong University of Science & Technology, 2006.
[3]
Du P, Liu X L, Fan J L , et al. Review of Research on Elevation Positioning of Concrete Filling Surface of Bored Piles[C]// 2018 International Conference on Civil and Hydraulic Engineering, Qingdao,China,Institute of Physics Publishing, 2018.
Li L L, Lu S T, Feng Y G , et al. Development of control device of concreting in excess for bored pile underwater with low elevation pile head[J]. Construction Technology, 2017,46(1):36-38.
Zhang L, Cui J J, Li J H . Study on constrution technique of super slenderness ratio bord pile[J]. Building Technology Development, 2017,44(20):92-94.
[6]
张海滨, 孙杰 , 等 .混凝土拌合物灌注桩灌注高度控制装置及其使用方法[P].中国专利,CN106013160 A, 2016 -10-12.
[6]
Zhang H B, Sun J, et al. Filling Height Control Device of Concrete Mixture in Bored Piles and its Application Method[P].Chinese Patent, CN106013160A, 2016 -10-12.
[7]
兰凯 . 钻孔桩砼灌面超声波测量的关键技术及其实现[D]. 北京:中国地质大学, 2008.
[7]
Lan K . Key technologies on using ultrasonic method for concrete casting level measurement in borded pile foundation and its realization[D]. Beijing: China University of Geosciences, 2008.
[8]
连绍平 . 采用探测杆测定桩顶砼面[J].探矿工程, 1999(3):38.
[8]
Lian S P . The concrete surface at the top of pile is measured by detecting rod[J]. Exploration Engineering, 1999(3):38.
Zhu J P, Liu L C, He X Q , et al. Construction technology of underw ater big diam eter bored pile for Linjiang super large bridge[J]. Building Construction, 2007,29(3):211-213.