综合物探方法在某电厂管廊渗漏探测中的应用
王彦兵, 金永军, 朱姝

Application of an integrated geophysical prospecting method in pipeline leakage detection in a power plant
WANG Yan-Bing, JIN Yong-Jun, ZHU Shu
表1 供电极距AB/2及相应测量极距MN/2变化序列
Table 1 The power supply pole distance AB/2 and the corresponding measurement pole distance MN/2 change sequence
(AB/2)/m (MN/2)/m 装置系数K
1.5 0.5 6.28
2.5 0.5 18.85
4 0.5 49.48
6 0.5 112.31
9 0.5 253.68
15 1.5 233.26
25 2.5 388.77
40 4 622.04