基于直升机航空重力同步地形的布格改正处理
|
屈进红 1,2(  ), 姜作喜 1,2, 周锡华 1,2, 王明 1,2, 罗锋 1,2
|
Airborne Bouguer gravity based on synchronous terrains surveyed using helicopter airborne gravimetry
|
QU Jin-Hong 1,2(  ), JIANG Zuo-Xi 1,2, ZHOU Xi-Hua 1,2, WANG Ming 1,2, LUO Feng 1,2
|
|
图3. 实测地形处理过程 a— 初步实测地形;b—切割线调平后实测地形;c—微调平后实测地形;d—剥离城市高楼后实测地形
|
Fig.3. Actual surveyed terrain processing a—initially obtain the actual surveyed terrain; b—actual surveyed terrain is levelled by the tie-line; c—actual surveyed terrain is levelled by microlevelling process; d—actual surveyed terrain after stripping off tall buildings
|
|
 |
|
|