川南地区页岩气井平台钻前工程物探集成技术
|
余长恒 1( ), 郑健 2, 张旭林 1, 周昊 2, 王安平 1, 刘磊 1, 李易 1
|
Application of the integrated engineering geophysical exploration technology in the predrilling stage of shale gas well platforms in southern Sichuan Province
|
YU Chang-Heng 1( ), ZHENG Jian 2, ZHANG Xu-Lin 1, ZHOU Hao 2, WANG An-Ping 1, LIU Lei 1, LI Yi 1
|
|
图5. 试验点2工程布置(a)及瞬变电磁法(b)、微动法(c)实验成果
|
Fig.5. Engineering layout of measuring point 2 (a) and test results of transient electromagnetic method (b) and fretting method (c)
|
|
|
|
|