井下钻孔电阻率法岐离率确定采动工作面“三带”顶界面发育高度 |
闫国才 |
The mine drilling resistivity method used to determine the development height of the "three zones" top interface of the mining face |
Guo-Cai YAN |
图5 回采位置距钻仓80 m处与距钻仓200 m处视电阻率差值断面 |
Fig.5 Sectional view of the apparent resistivity difference between the mining position at 80 m from the drill chamber and 200 m from the drill chamber |
![]() |