综合物探在地面塌陷区探测中的应用
|
邓中俊, 杨玉波, 姚成林, 贾永梅, 李春风
|
The application of integrated geophysical method to the detection of ground subsidence area
|
Zhong-Jun DENG, Yu-Bo YANG, Cheng-Lin YAO, Yong-Mei JIA, Chun-Feng LI
|
|
表1 钻孔验证工作量统计
|
Table 1 Drill verification workload statistics table
|
|
孔号 | 测线(距离) | 终孔深度/m | | | | YZK01 | 测线8(55 m) | 85.14 | 12.4 | 4.5 | 36.3 | 80.64 | 52.6 | 65.2 | 65 | 49.29 | YZK02 | 测线8(10 m) | 40.06 | 12.69 | 6.5 | 51.2 | 27.37 | 22.3 | 81.5 | 172.425 | 0 | YZK03 | 测线3(19 m) | 130.97 | 109.3 | 82.15 | 75.2 | 21.67 | 17.4 | 80.3 | 3470.481 | 225.15 | YZK04 | 测线7(46 m) | 120.35 | 14.47 | — | — | 105.88 | 83.9 | 79.2 | 132.354 | 12.6 |
|
|
|