The all-time apparent resistivity iteration inverse method was deduced in detail based on the current slanting wave of the TEM central loops unit. In the forward process, the turn-off time integral was represented analytically. The resistivity derivation could be transformed to the time derivation through the variable transformation in the inverse process. The calculation precision and speed were promoted by avoiding the numerical integral and differential calculation used in approximating the derivation. The standard database method was used to decrease the calculation time of probability integral in the inverse process of iteration as well as to improve the precision and speed. Then the survey data were processed and some problems were discussed on the basis of a few calculation examples.
杨生. TEM中心回线法计算考虑关断时间的全区视电阻率[J]. 物探与化探, 2008, 32(6): 647-651,664.
YANG Sheng. ALL-TIME RESISTIVITY CALCULATION IN CONSIDERATION OF TIME-OFF USING THE CENTRAL TEM LOOPS METHOD. Geophysical and Geochemical Exploration, 2008, 32(6): 647-651,664.
[1] Raab P,Frishnecht F.Desktop computer processing of coincident and central loop time domain electromagnetic data[J].U.S.Geol Surv. Open File Rep:83.
[2] 白登海,Maxwell Meju.瞬变电磁法中两种关断电流对响应函数的影响及其对应策略[J].地震地质,2001,23(2):245.
[3] 严良俊,徐世浙,胡文宝,等.中心回线瞬变电磁测深法快速电阻率成像方法及应用[J].煤田地质与勘探,2002,30(6):58.
[4] Kaufman A A.Harmonic and transient fields on the surface of a two layer medium[J].Geophysics,1979,44:1208.
[5] 蒋邦远.实用近区磁源瞬变电磁法勘探[M]. 北京:地质出版社.1998.
[6] Fitterman D V,Anderson W L.Effect of transmitter turn off time on transient sounding[J].Geoexploration,1987,24:131.
[7] 牛之琏.时间域电磁法原理[M].长沙:中南工业大学出版社.1992. 下转664页