The Poyang Lake giant railway bridge is located where the Poyang Lake enters the Yangtze River. As the area has complex geological conditions and well-developed faults, the selection and comparison of schemes for bridge sites through geological exploration seem especially important. By effective utilization of integrated geophysical prospecting and employment of various methods, the authors found out lithologic divisions and tectonic framework, thus obtaining fine geological effects. The results fully demonstrate the advantages of integrated exploration and integrated geophysical procpecting.
李玮, 李志华, 任春山, 方青利. 综合物探在鄱阳湖铁路特大桥勘察中的应用[J]. 物探与化探, 1997, 21(1): 67-73.
Li Wei, Li Zhihua, Ren Chunshan, Fang Qingli . THE APPLICATION OF INTEGRATED GEOPHYSICAL PROSPECTING TO THE EXPLORATION OF POYANG LAKE GIANT RAILWAY BRIDGE. Geophysical and Geochemical Exploration, 1997, 21(1): 67-73.